Kalea Bay Tower 500

Kalea Bay Tower 500 condos for sale at 13955 Old Coast Rd, Naples, FL 34110: 120 four-bedroom residences in six floor plans, with prices, association fees, flood zone and county records. Updated November 2026.

Aerial photo of the Kalea Bay Tower 500 site at 13955 Old Coast Rd, Naples, FL 34110, ringed, February 2023, before Tower 500 construction began

Kalea Bay Tower 500 is a 22-story, 120-residence condominium at 13955 Old Coast Rd, Naples, FL 34110, the fifth and final tower Soave Real Estate built at Kalea Bay, off Vanderbilt Drive near Wiggins Pass in unincorporated Collier County. Every residence has four bedrooms. For the rest of North Naples, start with our Naples guide.

Aerial photo of the Kalea Bay Tower 500 site at 13955 Old Coast Rd, Naples, FL 34110, ringed, February 2023, before Tower 500 construction began
The Tower 500 site (ringed) on Old Coast Road, Naples, in a February 2023 USDA NAIP aerial taken before Tower 500 construction began; Tower 400 is rising to its right

By Jesse McGreevy and Marc Comisar, Domain Realty Group. Data updated: November 2026. Call Domain Realty Group at 239-441-2816.

Kalea Bay Tower 500 at a Glance: What Buyers Are Looking At in November 2026

Kalea Bay Tower 500 is a new 22-story high-rise of 120 four-bedroom condominiums on Old Coast Road in North Naples. It topped out in mid-2025, MLS-fed listing sites reported its first closings in October 2026, and county records do not show the building yet. Data updated: November 2026.

The building in one table

ItemTower 500Where the figure comes from
Address13955 Old Coast Rd, Naples, FL 34110Collier County site address point (status Temporary)
JurisdictionUnincorporated Collier County, Cocohatchee Bay PUDEarlier Kalea Bay research and the 2023 commission report
DeveloperSoave Real Estate, through Lodge Abbott entitiesDeveloper site and county roll owner name
Height22 stories, 270 feet total approvedDeveloper and the October 2023 commission report
Residences120, six per floor, all four bedrooms and 4.5 bathsDeveloper residences page
Plan sizes3,983 to 4,954 total sq ft; 3,290 to 4,372 sq ft under airDeveloper floor plan table
Ceilings10 feet in main areas, 11 feet in penthousesDeveloper and launch coverage
Developer entry priceFrom $3.4 million (February 2024), from $3.5 million (2025)Launch advertorial and Business Observer
Flood zone at the address pointAE, base flood elevation 10 feetCollier copy of the effective FEMA map
Evacuation zoneACollier evacuation layer

Where Tower 500 sits inside Kalea Bay

Tower 500 is the northernmost of the five Kalea Bay towers. The county address point places it northwest of Tower 400 at 13945 Old Coast Rd, at the edge of the mangrove preserve that wraps the community's west and north sides. The developer describes it as the last waterfront building in Kalea Bay, oriented south and west over the water.

Search Tower 500 listings

See Kalea Bay Tower 500 condos for sale at 13955 Old Coast Rd on our listings search, or ask us about a showing. The search reads the MLS label KALEA BAY TOWER 500, so every row behind that link is a Tower 500 residence.

Is Kalea Bay Tower 500 Finished, and Where Does Construction Stand?

Yes in structure, and closings have started, but the public record is still catching up. The tower topped out in mid-2025, was in final finishing in April 2026, and MLS-fed public listing pages show the first closings from October 19, 2026. No certificate of occupancy date has been confirmed. Data updated: November 2026.

Milestones from the developer's own posts

We tracked the developer's construction posts from the first pilings to the final finishes. The dates below are the developer's, as posted.

DateMilestone reported by the developer
January 2, 2024Reservations open
Mid-February 2024Reservations begin converting to contracts
May 9, 2024Coming out of the ground, pilings finishing
October 24, 2024Concrete reaches the fifth floor
April 10, 2025Structure at the 18th floor, windows to the 12th
May 9, 2025Starting the 21st floor
June 18, 2025Penthouse level under way
July 25, 2025Crew top-off party
November 11, 2025Cabinets and wood floors going in, second crane removed
April 28, 2026Pool deck flooring, elevator testing, final paint to the 14th floor, lower floors in final clean
July 31, 2026Rooftop pool filled (developer social post)

A completion date that moved

Business Observer reported a September 2025 completion target in July 2025. Older listing remarks later moved that to September 2026, and listing remarks in November 2026 read late fall or the last quarter of 2026. The developer said in 2025 that it expected to sell out before construction ended; listings were still active in November 2026, so that expectation was not met.

What the county and state files show so far

The certified 2026 Collier roll in our county files, dated October 27, 2026, lists four Kalea Bay condominiums, Towers 100 to 400, with 484 parcels between them, and no Tower 500 condominium, no parcel at 13955 Old Coast Rd and no Tower 500 sale. The county sales file in that bundle ends on October 16, 2026, three days before the first reported closing. Florida's condominium extract, read November 11, 2026, also lists Towers 100 to 400 only. Treat Tower 500 parcel numbers, assessed values and recorded prices as not yet published.

What we could not confirm

The certificate of occupancy date, the recording date and book and page of the Tower 500 declaration, and the state filing for the Tower 500 condominium association were not confirmed for this guide. Earlier research recorded a state corporation filing named Tower 500 at Kalea Bay Condominium Association, Inc.; we did not re-read it. Ask for each of these in writing before you sign.

How Many Residences Does Tower 500 Have, and What Are the Six Floor Plans?

Tower 500 has 120 residences, six to a floor, and every one is a four-bedroom, 4.5-bath plan. The six stacks run from 3,983 to 4,954 total square feet, or 3,290 to 4,372 square feet under air, with private elevator foyers and floor-to-ceiling glass. Data updated: November 2026.

The six residence stacks

StackBedrooms and bathsTotal sq ftUnder air sq ftLanai sq ftDeveloper notes
Residence 014 plus den, 4.54,9544,372582Largest plan
Residence 024, 4.54,0703,453617Dining nook, butler's pantry
Residence 034, 4.53,9833,290693Lanai runs the full length of the residence
Residence 044, 4.53,983not confirmed (see below)693Same total and lanai as 03
Residence 054, 4.54,0703,453617Mirror of 02
Residence 064, 4.5, two owners' suites4,9374,311626Redesigned with a full glass west wall, island with sink, butler's pantry with sink and walk-in pantry

The Residence 04 figure that does not add up

The developer's page prints 3,920 square feet under air for Residence 04. Its own total (3,983) less its lanai (693) gives 3,290, the same as Residence 03. Until the Residence 04 floor plan sheet is checked, treat its air-conditioned area as unconfirmed and ask for the plan sheet.

Ceilings, glass and kitchens

The developer lists 10-foot ceilings in main living areas and 11 feet in penthouses, up from 9 feet in Towers 100 to 400, floor-to-ceiling window walls, and kitchens with Wolf and Sub-Zero appliances. These are the developer's descriptions of its finish package; confirm the specification for the residence under contract against the purchase agreement exhibits.

Why the extra ceiling height mattered at the county

The 2023 news report on the commission vote said the added height was granted so the tower could have 10-foot ceilings instead of 9-foot ones. The added stories and the added residences came in the same approval, described in the history section below.

Kalea Bay Tower 500 Prices: Developer Pricing, Reported Closings and Asking Prices

Tower 500 prices so far come from three public sources: the developer's advertised starting price, closings reported on MLS-fed listing pages in October 2026, and asking prices in November 2026. None is a county deed yet, so read every figure here as reported, not recorded. Data updated: November 2026.

Developer starting prices and sales pace

The launch advertorial of February 2024 gave a starting price of $3.4 million, and Business Observer reported a start of $3.5 million in July 2025. The developer reported $200 million on 40 reservations in the first month, more than $240 million by April 18, 2024, more than $290 million by April 18, 2025, and more than $330 million on 66 of 120 residences by mid-July 2025. Dividing the reported totals by the reported counts gives an average near $5.0 million in both February 2024 and July 2025.

Closings reported in October 2026

These three closings appear on MLS-fed public listing pages. Each closed at its list price, which fits developer contracts signed earlier and closed at completion. None was yet in the county file, so treat each as reported, not recorded. Price per square foot uses the under-air area of the stack.

ResidenceReported close dateReported priceStack under air sq ftPrice per sq ft under air
501October 19, 2026$3,865,0004,372about $884
1204October 23, 2026$4,650,0003,290about $1,413
906October 26, 2026$6,100,0004,311about $1,415

The 501 price likely reflects an early contract from 2024, which is why it sits well below the other two per square foot.

Asking prices on November 11, 2026

We tracked the Tower 500 rows on public listing pages on November 11, 2026: four active and three pending. Active asking prices were $7,495,000 (1206), $5,300,000 (506), $4,200,000 (804) and $3,975,000 (605). Pending rows showed $7,125,000 (PH05), $4,985,000 (1704) and $4,895,000 (406). On the stack under-air areas, asks ran from about $1,135 a square foot (406) to about $2,063 (PH05). One listing remark said residence 506 was closing in November 2026.

How Tower 500 compares with Kalea Bay resales

County files show 18 qualified resales in Towers 100 to 400 in the 12 months to November 2026, with a median of $3,775,000 and a range of $2,700,000 to $6,900,000. Tower 400 plans run 3,723 to 3,922 total square feet, so a Tower 500 plan is larger by roughly 60 to 1,230 square feet depending on the pair compared.

Thinking of buying at Kalea Bay Tower 500?

Tell us your timeline on our contact page and we will pull the current Tower 500 rows, the most recent reported closings and the papers listed later in this guide before you tour. You can also browse our listings or meet our agents.

What Do Tower 500 Owners Pay in Condo Fees, Master Fees and Club Dues?

Tower 500's own condominium budget has not been published, so no one can quote its assessment from a public document yet. What can be stated is the structure: a condominium assessment, a master association fee and mandatory club dues, plus taxes and insurance, using the Tower 400 2025 figures as a guide only. Data updated: November 2026.

The Tower 400 figures as a guide

Tower 400's 2025 state disclosure sheet lists condominium assessments of $8,369.75 to $8,529.92 a quarter, a master association fee of $295.87 a quarter and club dues of $7,503.40 a year plus sales tax. Those are Tower 400 numbers, not Tower 500 numbers.

LineTower 400, 2025A year
Condominium assessment$8,369.75 to $8,529.92 a quarter$33,479.00 to $34,119.68
Master association$295.87 a quarter$1,183.48
Club dues (before sales tax)$7,503.40 a year$7,503.40
Sum of the threeAsk us$42,165.88 to $42,806.56

The one Tower 500 fee figure in a listing

One MLS-fed listing for residence 406 shows an association fee of $3,298 a month, about $39,576 a year. The listing does not say what that figure includes, so ask the listing agent and the association whether it covers the condominium assessment alone or adds the master and club lines.

The $50,000 club transfer fee and who skips it

The Club at Kalea Bay membership agreement (version of May 21, 2025) charges resale buyers a transfer fee, $50,000 in 2025, and waives it for an initial purchaser of a unit in the community. A buyer from the developer is therefore not charged that fee. Whether someone who takes an assignment of a pre-closing contract counts as an initial purchaser is not published; get that answer in writing from the developer before an assignment.

Fees not yet published

The deposit schedule, escrow agent, any developer closing fee, reserve figures and the first-year Tower 500 budget were not published as of November 2026. A community development district was not found in the research for Kalea Bay; confirm on the tax bill once Tower 500 parcels reach the roll.

The Club at Kalea Bay and the Tower 500 Rooftop: Amenities Tied to Ownership

Owning in Tower 500 brings mandatory membership in The Club at Kalea Bay, a non-equity club owned by the developer's entity, with no member voting rights. The tower adds its own rooftop terrace and pool. The descriptions below are the developer's marketing claims unless a public record is named. Data updated: November 2026.

The Tower 500 rooftop

The developer describes a 7,500-square-foot rooftop terrace with a negative-edge pool and deck, an open-air fitness area and a sky lounge, and posted on July 31, 2026 that the Tower 500 pool had been filled. Residences reach their own floors through private elevator foyers; the 406 listing describes two-car garage parking, which we could not confirm for every residence.

The shared club

The developer describes an amenity center of 88,000 square feet (Soave's portfolio page says 100,000), with three pools, two restaurants (Driftwood Cafe and Salt and Oak), four Har-Tru tennis courts, eight pickleball courts, a wellness center and guest suites. Club dues were $7,503.40 a year plus sales tax in 2025.

Beach access and golf

Kalea Bay is not on the Gulf. The developer offers an optional, separately purchased beach membership with a shuttle to The Club at Moraya Bay on Vanderbilt Beach; no current price was published. No golf membership comes with ownership; Kinsale Golf Club nearby is a separate club.

Gate and grounds

The community has a manned gatehouse. The Cocohatchee Bay PUD sets aside 181.50 acres of preserve, and the Cocohatchee River and mangrove preserve lie west and north of the tower.

How Kalea Bay Tower 500 Came to Be: Entitlement, Developer and Builder

Tower 500 exists in its current form because of a 2023 county approval that added height and residences to the fifth tower. Soave Real Estate, part of Detroit-based Soave Enterprises, developed it through its Lodge Abbott entities, with its own construction arm as general contractor. Data updated: November 2026.

The October 2023 commission vote

A News-Press and Naples Daily News report of October 11, 2023 said Collier commissioners voted unanimously to give the developer three more stories and 10 more condos on the fifth tower, for a total height of 270 feet. In exchange the developer gave up development rights on a commercial tract at Vanderbilt Drive and Wiggins Pass Road and agreed to give the county a parcel for marina parking plus $1 million toward it. Neighbors opposed it as a breach of the earlier settlement.

The design and construction team

A Pottorff project case study names Van Auken Miller Architect LLC as architect, Soave Development Company as general contractor and JND Mechanical as mechanical contractor. The developer's in-house brokerage handles exclusive sales.

Soave's other Naples towers

Soave also developed Moraya Bay, a 72-residence tower on Vanderbilt Beach, which is where the Kalea Bay beach shuttle goes. Soave's portfolio listed no next Naples project as of November 2026.

Flood Zone, Evacuation Zone and Storm History at Tower 500

Collier's copy of the effective FEMA map puts the Tower 500 address point in Zone AE with a 10-foot base flood elevation, and the county places it in Evacuation Zone A. New preliminary FEMA maps for Collier are expected to take effect around summer 2027. Data updated: November 2026.

Flood map readings at the address point

LayerReading at 26.30029 N, 81.82298 WNote
FEMA flood zoneAE, coastal floodplainCollier's copy of the effective map
Base flood elevation10 feet (static)Earlier readings nearby showed 9 feet; ask for the building's elevation certificate
FIRM panel12021C0187J, effective February 8, 2024Collier panel layer
Evacuation zoneACollier evacuation layer
Coastal High Hazard Area layerNo polygon at the pointA planning layer, not an insurance zone
Elevation certificate layerNone on file for the Tower 500 envelopeNormal for a new building; request it

The preliminary maps

Collier released new preliminary flood maps on March 20, 2025. The 90-day appeal period began on August 19, 2026, and the county gives summer 2027 as the target effective date. A buyer closing in 2026 or 2027 should ask the insurance agent to quote against both the effective and the preliminary map.

Storms since 2022

During Hurricane Ian on September 28, 2022, the Delnor-Wiggins Pass sensor about 1.9 miles away recorded a storm tide of 10.24 feet NAVD88; the Tower 500 site was vacant then. Helene in September 2024 brought 3 to 4 feet of surge to Naples beach streets, and Milton in October 2024 brought 3 to 5 feet from Bonita Beach to Marco. Construction continued through both: concrete reached the fifth floor on October 24, 2024, two weeks after Milton.

Questions for the association about storms

Ask the association for its master policy declarations, its flood policy limits and its wind deductible. Ask also for the design wind speed on the permit drawings, which the research could not settle between 160 and 170 miles an hour.

Insurance, Milestone Inspections and Florida Condo Law for a New Tower

A new tower carries the same statutory duties as an older one, on a later clock. Tower 500's first milestone inspection is decades away, but the turnover inspection, the reserve study requirement and the developer-sale disclosure rules apply from the start. Data updated: November 2026.

Flood coverage limits for a 120-unit building

The National Flood Insurance Program's residential condominium building policy caps building coverage at $250,000 times the number of units. For 120 residences that ceiling is $30 million, which is likely below the replacement cost of a Gulf-coast concrete tower. Whether the association buys excess flood coverage is a question for its insurance agent. Collier's Community Rating System Class 5 gives a 25 percent discount on NFIP premiums in the special flood hazard area.

HO-6 and loss assessment

Each owner insures the interior and contents under an HO-6 policy. Because a shortfall in the association's coverage can be passed to owners as a special assessment, ask the agent about loss assessment coverage sized to the association's deductibles.

Milestone inspections under section 553.899

Collier's list of milestone buildings, as of January 2026, puts the four existing Kalea Bay towers on a 25-year schedule; Tower 400, with a certificate of occupancy dated April 11, 2024, is due in 2049. Tower 500 was not on that list. On the same 25-year schedule, its first milestone would fall about 25 years after its certificate of occupancy year, about 2051 if that year is 2026.

Structural integrity reserve study and turnover

Section 718.112(2)(g), Florida Statutes, requires a structural integrity reserve study for a building of three or more stories at least every 10 years, and section 718.301(4)(p) requires a turnover inspection report before the developer hands control to the owners. Neither had been filed publicly for Tower 500 as of November 2026, which is normal before turnover.

Buying from the Developer Versus Buying a Tower 500 Resale

A buyer can reach Tower 500 two ways: a contract with the developer, or later, a resale from an owner. The paperwork, the cancellation rights, the club fee and the approval steps differ between the two, and that difference is worth more than a few thousand dollars. Data updated: November 2026.

The developer sale

A developer sale runs under section 718.503(1), Florida Statutes, which gives the buyer 15 days after signing, or after receiving the required documents, to cancel. The initial purchaser is not charged the club transfer fee and skips the resale application and the rights of first refusal that apply on resale.

The resale

A resale runs under section 718.503(2), which now requires the seller to hand over the governing documents, the budget and financial report, and the milestone, reserve study and turnover inspection items that apply. The buyer pays the club transfer fee, $50,000 in 2025, and goes through association approval and two rights of first refusal.

Side by side

QuestionDeveloper contractResale
Club transfer feeWaived for an initial purchaserCharged, $50,000 in 2025
Cancellation period15 days under 718.503(1)Under the contract and 718.503(2)
Association approval and rights of first refusalNot applied to the initial purchaseTwo rights of first refusal and approval
Known budgetNot yet publishedAssociation budget and financial report
Inspectable finished residenceVaries by closing dateYes

Estoppel and the master association

At resale, the condominium association's estoppel certificate is governed by section 718.116, and the master property owners association falls under chapter 720. The master declaration is the Declaration of Restrictive Covenants for Kalea Bay recorded at Official Records Book 5449, Page 1939.

Leasing and Pet Rules: What Is Published and What Is Not

Tower 500's own leasing and pet rules were not published as of November 2026, so the best public guide is Tower 400's sales packet. That packet sets a 30-day minimum lease, no more than four leases a year, and no pets in leased units. Treat those as Tower 400 rules until Tower 500's documents are in hand. Data updated: November 2026.

Tower 400 rules as a guide

RuleTower 400 packet (2025)Tower 500
Minimum lease30 daysNot published
Leases a yearNo more than fourNot published
Pets in leased unitsNot allowedNot published

Where to find the Tower 500 rules

The declaration, bylaws and rules come with the developer's disclosure package under section 718.503(1). The domain registered for a Tower 500 association site was parked in November 2026, and the master association's site linked only to Towers 100 to 400.

From Tower 500 by Road: Beaches, Hospital, Shopping and I-75

Tower 500 sits on Old Coast Road west of Vanderbilt Drive, about 2.2 miles from the nearest Gulf beach access at Conner Park and about 3.9 miles from NCH North Hospital. The times below are free-flow estimates; add time from January to April. Data updated: November 2026.

Drive table

DestinationDistanceFree-flow time
Conner Park beach access (Bluebill Ave)2.2 miabout 6 min
Delnor-Wiggins Pass State Park3.1 miabout 10 min
Vanderbilt Beach Park and county garage3.6 miabout 10 min
NCH North Hospital and emergency department3.9 miabout 9 min
Mercato4.4 miabout 10 min
I-75 Exit 111 (Immokalee Rd)about 6.8 miabout 15 min
I-75 Exit 116 (Bonita Beach Rd)about 6.9 miabout 15 min
Waterside Shops7.0 miabout 13 min
Coconut Point (Estero)9.3 miabout 17 min
Downtown Naples, Fifth Avenue South13.1 miabout 25 min
Southwest Florida International Airport25.3 to 26.1 miabout 39 min

Groceries and daily errands

Publix at the Granada Shoppes is about 2.9 miles away, Trader Joe's about 3.3 miles, and Whole Foods and Mercato about 4.3 to 4.4 miles. Physicians Regional North is about 4.0 miles away.

Parks and the water

Barefoot Beach Preserve is about 6.2 miles north. Cocohatchee River Park, the county marina tied to the 2023 parking agreement, sits on Vanderbilt Drive at the Cocohatchee River.

Assigned public schools

For the Tower 100 to 400 addresses, the Collier County Public Schools zone lookup for the 2027 school year returned Naples Park Elementary, North Naples Middle and Aubrey Rogers High. Tower 500's address point is still temporary and was not queried separately, so confirm the assignment for 13955 Old Coast Rd on the district's zone lookup.

Tower 500 Beside Other Condos Buyers Weigh in North Naples

Most Tower 500 shoppers also look at a resale in Towers 100 to 400 and at other new or recent Gulf-coast towers. The table sets out the trade-offs from public records and the developer's own figures, without ranking one above another. Data updated: November 2026.

Comparison table

OptionWhat differs from Tower 500
Resale in Kalea Bay Towers 100 to 400Immediate occupancy, published budgets and inspectable homes, but the club transfer fee, approval and rights of first refusal, 9-foot ceilings and smaller plans (Tower 400: 3,723 to 3,922 total sq ft); 12-month county median $3,775,000
Moraya Bay (Soave, Vanderbilt Beach)Same developer, 72 residences on the beach itself
Ritz-Carlton Residences, Estero BayBranded new construction in Estero; Business Observer reported more than $700 million in sales by July 2025
Rosewood and Four Seasons residences, NaplesNew deliveries with closings expected in 2026, the same window as Tower 500
Older Vanderbilt Beach towersSmaller residences and lower entry prices on the Vanderbilt Beach strip

Other Naples condominium guides

For older buildings on the beach side of Vanderbilt Drive, read our guides to Vanderbilt Towers and Regatta at Vanderbilt Beach, which set out county deeds and association records building by building.

The whole community

For the community as a whole, including the club, its history and living there, read the Kalea Bay guide on our sister site. This page stays on the Tower 500 building and its listings.

Next Steps at Kalea Bay Tower 500: Papers, Showings and Valuations

Three practical steps close this guide: the documents to collect before you sign or close, how a buyer starts a Tower 500 search with our team, and how an owner asks for a valuation once Tower 500 resales begin. Each step leans on the records described above. Data updated: November 2026.

Papers to collect before you sign

From the developer, ask for the declaration, bylaws, rules, the estimated budget, the club membership agreement, the deposit and escrow terms and the Residence 04 plan sheet if it applies. From the insurance agent, ask for quotes on the effective and preliminary flood maps. At closing, ask for the elevation certificate and the certificate of occupancy date.

Ready to tour Tower 500?

Send us your timeline through our contact page and we will set out the current listing rows, the reported closings and the open questions above for the residence you are weighing. You can also search MLS listings under the KALEA BAY TOWER 500 label.

Thinking of selling a Tower 500 residence?

Until county deeds for Tower 500 are recorded, a valuation leans on the reported closings, the asking prices and the county record of Tower 100 to 400 resales. Request a home valuation and we will set those records out for your stack and floor.

Frequently Asked Questions About Kalea Bay Tower 500

Where is Kalea Bay Tower 500?

Tower 500 is at 13955 Old Coast Rd, Naples, FL 34110, the northernmost of the five Kalea Bay towers, west of Vanderbilt Drive near Wiggins Pass in unincorporated Collier County. The developer's sales gallery is across the road at 13910 Old Coast Rd.

Is Kalea Bay Tower 500 finished?

The tower topped out in mid-2025 and was in final finishing in April 2026. MLS-fed listing pages show the first closings from October 19, 2026. No certificate of occupancy date was confirmed as of November 2026.

How many residences and stories does Tower 500 have?

Tower 500 has 22 stories and 120 residences, six per floor. Collier approved three more stories and 10 more condos for the fifth tower in October 2023, for a total height of 270 feet.

How many bedrooms do Tower 500 residences have?

Every residence has four bedrooms and 4.5 baths. Residence 01 adds a den, and Residence 06 has two owners' suites.

What are the Tower 500 floor plan sizes?

The six stacks run from 3,983 to 4,954 total square feet and 3,290 to 4,372 square feet under air. Residence 01 is the largest; Residences 03 and 04 are the smallest by total area.

How much do Tower 500 condos cost?

The developer advertised prices from $3.4 million in February 2024 and from $3.5 million in 2025. Reported October 2026 closings ran $3,865,000 to $6,100,000, and November 2026 asking prices ran $3,975,000 to $7,495,000. These come from listing pages, not county deeds.

What did the first Tower 500 closings sell for?

MLS-fed pages reported 501 at $3,865,000 on October 19, 2026, 1204 at $4,650,000 on October 23, 2026, and 906 at $6,100,000 on October 26, 2026, each at its list price.

Are Tower 500 sales in the county records yet?

Not in the county files we hold. The certified 2026 roll dated October 27, 2026 lists Towers 100 to 400 only, and its sales file ends on October 16, 2026, before the first reported Tower 500 closing.

How many Tower 500 residences are still available?

The developer publishes no count. The last public figure was 66 of 120 sold in July 2025. On November 11, 2026, public listing pages showed four active and three pending Tower 500 rows.

What are the HOA fees at Kalea Bay Tower 500?

Tower 500's budget is not published. As a guide, Tower 400's 2025 condominium assessment ran $33,479.00 to $34,119.68 a year, plus $1,183.48 to the master association and $7,503.40 in club dues before sales tax. One Tower 500 listing shows $3,298 a month.

Do Tower 500 buyers pay the $50,000 club transfer fee?

Not when buying from the developer. The club agreement waives the transfer fee for an initial purchaser. Resale buyers pay the current fee, $50,000 in 2025. Membership and annual dues apply to every owner.

Is membership in The Club at Kalea Bay mandatory?

Yes. Every owner is a member of The Club at Kalea Bay, a non-equity club owned by the developer's entity, with no member voting rights. Dues were $7,503.40 a year plus sales tax in 2025.

Does Tower 500 have a rooftop pool?

The developer describes a 7,500-square-foot rooftop terrace with a negative-edge pool, an open-air fitness area and a sky lounge, and posted on July 31, 2026 that the pool had been filled.

Is golf included with a Tower 500 residence?

No. Kalea Bay has no bundled golf membership. Kinsale Golf Club nearby is a separate club with its own membership.

Can Tower 500 owners reach the beach?

Kalea Bay is not on the Gulf. The developer offers an optional, separately purchased beach membership with a shuttle to The Club at Moraya Bay on Vanderbilt Beach. The nearest public beach access, Conner Park, is about 2.2 miles by road.

Who developed and built Kalea Bay Tower 500?

Soave Real Estate, part of Detroit-based Soave Enterprises, developed it through Lodge Abbott entities. A Pottorff case study names Van Auken Miller Architect as architect, Soave Development Company as general contractor and JND Mechanical as mechanical contractor.

Why is Tower 500 taller than the other Kalea Bay towers?

In October 2023 Collier commissioners approved three more stories and 10 more condos for the fifth tower, for 270 feet in total, so its ceilings could be 10 feet instead of 9.

What flood zone is Kalea Bay Tower 500 in?

Collier's copy of the effective FEMA map puts the Tower 500 address point in Zone AE with a 10-foot base flood elevation, on panel 12021C0187J, effective February 8, 2024.

What hurricane evacuation zone is Tower 500 in?

Collier County places the Tower 500 address point in Evacuation Zone A, the first zone ordered to leave when the county calls an evacuation.

Will the new FEMA maps change Tower 500's flood zone?

Collier released preliminary maps on March 20, 2025, opened the 90-day appeal period on August 19, 2026, and expects the new maps to take effect around summer 2027. Ask your insurance agent to quote against both maps.

How did Hurricane Ian affect the Tower 500 site?

The site was vacant during Ian on September 28, 2022. A sensor at Delnor-Wiggins Pass about 1.9 miles away recorded a storm tide of 10.24 feet NAVD88.

When is Tower 500's first milestone inspection due?

Tower 500 was not on Collier's January 2026 milestone list. Collier lists the other Kalea Bay towers on a 25-year schedule, so Tower 500's first milestone would fall about 25 years after its certificate of occupancy year, about 2051 if that year is 2026.

Does Tower 500 have a structural integrity reserve study?

None was filed publicly as of November 2026. Section 718.112(2)(g) requires one at least every 10 years, and section 718.301(4)(p) requires a turnover inspection report before the developer hands over control.

Can I cancel a Tower 500 contract with the developer?

Section 718.503(1), Florida Statutes, gives a buyer from the developer 15 days to cancel after signing or after receiving the required documents, whichever is later. Confirm the exact window in the Tower 500 contract.

Can I rent out a Tower 500 residence?

Tower 500's leasing rules were not published as of November 2026. Tower 400's rules set a 30-day minimum and no more than four leases a year, so read the Tower 500 declaration before planning any rental.

Are pets allowed in Tower 500?

Tower 500's pet rules were not published. Tower 400's rules bar pets in leased units. Ask for the Tower 500 rules in the developer's disclosure package.

Is there a CDD fee at Kalea Bay Tower 500?

None was found in the research for Kalea Bay. Confirm on the first tax bill once Tower 500 parcels reach the county roll.

Which public schools serve Tower 500?

For the other Kalea Bay towers, the district lookup returned Naples Park Elementary, North Naples Middle and Aubrey Rogers High. Confirm for 13955 Old Coast Rd on the district's zone lookup once the address is permanent.

How far is Tower 500 from a hospital?

NCH North Hospital and its emergency department on Health Park Boulevard are about 3.9 miles away, about 9 minutes by road in free-flowing traffic.

How far is Tower 500 from Southwest Florida International Airport?

About 25.3 to 26.1 miles by road, roughly 39 minutes in free-flowing traffic. Add time in season, from January to April.

Is Kalea Bay Tower 500 gated?

Yes. Kalea Bay has a gatehouse with 24-hour manned security, shared by all five towers.

As a Tower 500 seller, what must I give a buyer before closing?

Under section 718.503(2), a reselling owner gives the buyer the governing documents, the budget and financial report and the inspection and reserve items that apply. Under section 689.302, a seller also discloses known flood damage, flood claims and flood assistance.

What our clients say about Domain Realty Group

★★★★★ "Marc Comisar did an excellent job working with a very difficult client (me) selling our condo in a tough condo market. He went above and beyond."

Verified Google review. Derek Dixon, on selling a condominium with Marc Comisar of Domain Realty Group.

★★★★★ "Their recommendation on pricing my unit was sound and proved prescient. I never questioned their integrity and found it easy to rely on their recommendations. I would work with them again in a heartbeat."

Verified Google review. Charlie Carroll, on pricing and selling a unit with Domain Realty Group.

Read every review on our Google Business Profile.

About Domain Realty Group

Domain Realty Group serves Lee, Collier and Charlotte counties from offices in Naples, Bonita Springs and Fort Myers. Domain Realty Group has been the #1 team in Southwest Florida since 2012, with more than $2.5 billion in team production and more than 4,000 transactions. In North Naples our agents work the Vanderbilt Drive and Wiggins Pass condominium market, Kalea Bay among it.

Jesse McGreevy and Marc Comisar lead the team with over 45 years of combined direct experience. Read about Domain Realty Group or meet our agents. We are proud to be the #1 team in Southwest Florida since 2012.

Domain Realty Group
Naples office: 9180 Galleria Ct #200, Naples, FL 34109
Bonita Springs and Estero office: 24031 S Tamiami Trl #101, Bonita Springs, FL 34134
Fort Myers office: 8290 College Parkway, Unit 201, Fort Myers, FL 33919

Brokered by Domain Realty, a licensed Florida real estate brokerage. Florida Real Estate Commission (FREC) licensed. All agents are licensed Florida real estate professionals.

Data updated: November 2026.

Sources