Estero Planning, Zoning and Design Board October 20, 2026 Recap: Coconut Point Apartments Case Continued to November 17

Estero’s Planning, Zoning and Design Board continued the Waypoint Residences case to a date certain of Tuesday, November 17, 2026, after the applicant asked for a 30-day continuance at the end of the board’s Tuesday, October 20, 2026 hearing. The motion to continue passed 8-0 on a roll call vote, so the board made no recommendation to the Village Council on the plan to replace the closed Regal theater at Coconut Point, 8021 Cinema Way, with a 355-unit, four-story apartment building and parking garage.

Update, October 26, 2026: the Village has posted the transcript of the meeting. Our first recap, published October 22, left the board’s action to the official record. This version reports the outcome from that transcript. For more on the Village, see our Estero area guide.

Meeting at a glance

  • Body: Village of Estero Planning, Zoning and Design Board (PZDB)
  • Date and time: Tuesday, October 20, 2026, 4:30 p.m. Eastern; the transcript shows the gavel at 4:31 p.m. and adjournment at 7:14 p.m.
  • Main item: Coconut Point Zoning and DRI Amendments, Waypoint Residences, case numbers DCI2026-E002 and DRI2026-E001, District 6
  • Outcome: continued to Tuesday, November 17, 2026, by an 8-0 roll call vote
  • Video: meeting video player, event 279
  • Transcript: realtime captioning transcript posted by the Village
  • Agenda: agenda PDF and full agenda packet

What the board did

  1. Agenda: approved 7-0 on a roll call vote. Board Member Barry Jones had not yet arrived when the roll was called.
  2. Consent agenda: the minutes of the board’s September 15, 2026 meeting were approved by voice vote.
  3. Waypoint Residences: after the presentations, public comment and a poll of board members, the chair offered the applicant the choice of a continuance or an up or down vote that night. The applicant’s team asked for a 30-day continuance. Village staff gave November 17 as the date certain. Board Member Michael Sheeley moved to continue the case to that date and Board Member Barry Jones seconded.

The roll call on the continuance was 8-0. Voting yes: Kristin Jeannin, Barry Jones, Al Paivandy, Michael Sheeley, James Tatooles, Jim Wallace, Dan Williams and Chair Anthony Gargano.

Why the case was continued

Before any motion, the chair polled the board for specific direction so the applicant could decide whether to come back with changes. Members said they supported reusing the theater site and the concept of apartments at Coconut Point, and focused on how the building is laid out on the site. The concerns they named included:

  • A single garage entrance. Several members called one way in and out of the 648-space garage a problem and raised how cars would queue at the entry. A second entry, or a route from the south into the garage, was suggested.
  • Mass on the south, west and north sides. Members described those sides as one long, tall wall and asked for breaks, steps from three to four stories, or a repeat of the articulation already shown on the north half of the west side.
  • Room for landscaping at the base. Members said the south side leaves too little depth for layered planting against a four-story building, and asked for more green space there and trees spaced along the facades.
  • Connection to the shopping center. Members asked that the building tie into the planned green space with a courtyard or open space rather than a parking lot between them.
  • Trash pickup. One member called the waste pickup arrangement across a single drive clumsy and asked that it be rethought.

The applicant’s team and the mall owner’s representative explained that the surface parking between the building and the center is meant to serve restaurants, events and future uses as well as residents. During public comment, residents of The Residences at Coconut Point and Shadow Wood spoke, and a statement read for the board of The Residences at Coconut Point asked the board to require more revisions or continue the application.

The Waypoint Residences case

What is proposed

Waypoint Residential, with authorization from property owner Coconut Point Developers, LLC, has asked the Village to amend the Coconut Point Mixed Use Planned Development (MPD) zoning and the Development of Regional Impact (DRI) development order. The draft zoning ordinance describes a site of about 5.37 acres. According to the staff report, the plan includes:

  • A four-story building with 355 apartment units on the theater site, south of Target and north of The Residences at Coconut Point.
  • A four-story parking garage with 648 spaces inside the building footprint, plus shared surface parking to the west that is owned by Simon.
  • Vehicle access to the building from Via Umbria Way off Via Coconut Point, with surface lot access from the mall’s internal road by way of Via Monte Carlo Way.

What staff recommends

Village staff recommends approval with the conditions in the draft ordinance, including no blasting, concrete block exterior walls, a 48-inch hedgerow and added trees along the Via Coconut Point buffer, applicant-maintained median landscaping on Via Coconut Point and a replat before a local development order. The draft caps height at 45 feet to the main parapet and 53 feet to the top of the architectural towers, four stories at most. Those conditions can change before November 17, since staff told the board conditions can be fine-tuned during a continuance.

Parking and traffic

The Land Development Code calls for 2 spaces per apartment plus 10% for visitors, 781 spaces for 355 units. The draft ordinance sets a deviation of 1.8 spaces per unit including visitor parking, the figure the Village’s consultant, Trebilcock Consulting, recommended. Staff’s summary of the traffic study puts the apartments at 1,598 daily two-way trips, compared with 4,680 daily trips (Friday) for the theater use, and reports no road capacity work is required.

What happens next

The case returns to the Planning, Zoning and Design Board on Tuesday, November 17, 2026, the date certain set in the motion. The board’s recommendation, whenever it comes, goes to the Village Council, which holds a first reading and then a second reading with a public hearing; the draft ordinance leaves those dates blank. Nothing on this site has been approved by the Village.